Teliamura: Tripura Legislative Assembly Chief Whip and Teliamura MLA Kalyani Saha Roy on Monday led a review meeting and field inspection to address waterlogging issues caused by ongoing National Highway construction between Icharbil and Korailong Choumuhani. Local residents have raised concerns that several existing earthen drains were blocked during the construction process, resulting in rainwater entering residential areas with the arrival of the monsoon.
Consequently, officials from multiple departments conducted a joint inspection and discussed immediate solutions. Authorities have proposed temporary drainage measures and assured residents that corrective steps will be implemented at the earliest to prevent further hardship.
Read More: Tripura Gets ₹427 Crore Boost for Urban Projects
Key Facts
- Location: Teliamura, Tripura
- Highway Stretch: Khowai–Teliamura–Agartala National Highway
- Affected Area: Icharbil to Korailong Choumuhani
- Issue: Waterlogging due to blocked drainage channels
- Lead Official: Kalyani Saha Roy
- Departments Involved: NHIDCL, PWD, DWS, Water Resources Department, Municipal Council
- Proposed Solution: Temporary earthen drains and improved water drainage
Meeting Held to Address Public Concerns
Tripura Legislative Assembly Chief Whip Kalyani Saha Roy participated in a crucial discussion meeting at the Teliamura Municipal Council conference hall to review issues linked to the ongoing National Highway construction.
During the meeting, officials discussed complaints from local residents regarding water accumulation in several residential areas. Moreover, public representatives highlighted the urgent need to improve drainage before monsoon rainfall intensifies.
Blocked Drains Causing Waterlogging
According to Saha Roy, the highway construction work along the Khowai–Agartala route via Teliamura has blocked several pre-existing earthen drains.
As a result, rainwater has started entering homes and low-lying areas with the onset of the monsoon season. Consequently, many residents have experienced inconvenience and property-related concerns due to waterlogging.
Furthermore, local communities have urged authorities to take immediate action to restore proper drainage and prevent further flooding.
Joint Inspection Conducted at Affected Sites
To assess the situation firsthand, Saha Roy joined senior officials for a field inspection of the affected locations between Icharbil and Korailong Choumuhani.
The inspection team included the Sub-Divisional Magistrate (SDM), Deputy Chief Executive Officer, Executive Officer, representatives from NHIDCL and Siptech, Executive Engineer of the Public Works Department, and officials from the Drinking Water and Sanitation and Water Resources Departments.
Additionally, the Municipal Council Chairman, Vice-Chairman, and councilors participated in the inspection and interacted with local residents.
Authorities Discuss Immediate Solutions
Following the site visit, officials held detailed discussions on practical and short-term solutions to address the drainage problem.
One of the key proposals involves constructing temporary earthen drains to ensure smooth water flow during the monsoon season. Therefore, authorities expect these measures to reduce water accumulation and protect nearby residential areas.
Moreover, engineers and departmental representatives reviewed technical options to improve drainage infrastructure around the ongoing highway construction zone.
Government Assures Quick Action
Saha Roy emphasized that authorities have already initiated necessary measures following the field assessment.
She stated that the administration remains committed to resolving the issue quickly and ensuring that residents do not continue to suffer from waterlogging. Furthermore, she assured that all concerned departments will work together to implement effective solutions.
As a result, local residents can expect coordinated efforts to improve drainage and minimize monsoon-related challenges in the coming weeks.
Focus on Public Welfare and Infrastructure
The Chief Whip reiterated that public welfare remains a top priority while major infrastructure projects continue across the region.
While the National Highway project aims to improve connectivity and transportation, officials stressed that construction activities must not adversely affect local communities. Therefore, the government plans to balance development goals with the needs of residents.
Question & Answer
What happened in Teliamura?
Officials reviewed waterlogging issues linked to ongoing National Highway construction and conducted a field inspection in affected areas.
Why are residential areas facing waterlogging?
Several existing earthen drains were reportedly blocked during highway construction, causing rainwater to accumulate during the monsoon season.
Who led the inspection?
Tripura Assembly Chief Whip and Teliamura MLA Kalyani Saha Roy led the review and inspection along with officials from multiple departments.
What solutions have been proposed?
Authorities discussed constructing temporary earthen drains and improving water drainage systems in affected areas.
Which departments participated in the inspection?
Officials from NHIDCL, PWD, DWS, Water Resources Department, Municipal Council, and local administration took part in the inspection.
Location Context
Teliamura, located in Tripura’s Khowai district, serves as an important transit point connecting Agartala with other parts of the state. Therefore, the ongoing National Highway project plays a crucial role in improving regional connectivity. At the same time, effective drainage management remains essential to protect residents and maintain infrastructure during the monsoon season.

