Assam NH-715 Widening: 4-Lane Highway with Elevated Roads

0
Assam NH-715 widening
Ads

The government has approved the Assam NH-715 widening project, a ₹6,900 crore initiative to modernize the Kalibor–Numaligarh corridor. The authorities stated that the 86 km stretch will become a four-lane highway, while approximately 34.5 km inside Kaziranga National Park will be elevated. This approach will reduce wildlife disturbance and enhance road safety.

Authorities expect the upgrade to improve traffic flow, reduce travel time, and boost economic activity in Assam and the Northeast region. The project is considered a critical infrastructure milestone for both commerce and tourism.

Scope of the Assam NH-715 Widening Project

The highway upgrade will cover the entire Kalibor–Numaligarh corridor, connecting industrial hubs, towns, and tourist destinations. Notably:

  • The 86 km highway will have four lanes.
  • The 34.5 km stretch inside Kaziranga will be elevated, allowing wildlife to move safely underneath.
  • Authorities will install modern signage, drainage systems, and road safety measures throughout the corridor.

Furthermore, elevated roads will protect endangered species, such as one-horned rhinoceroses and elephants, while ensuring faster travel for commuters.

Economic Benefits of Assam NH-715 Widening

The highway expansion will generate multiple benefits:

  • Reduce travel time between Kalibor and Numaligarh.
  • Support industries including oil, tea, and timber by improving logistics.
  • Boost tourism by providing safer and faster access to Kaziranga National Park.

In addition, the project will create thousands of construction jobs and stimulate trade in the region. According to The Economic Times, officials expect the project to strengthen the overall economy of Assam and Northeast India.

Environmental Measures in Kaziranga

Within Kaziranga, the highway will run on 34.5 km of elevated roads, a first in the region. This design will:

  • Wildlife corridors and underpasses will allow animals to cross safely.
  • Construction will follow eco-friendly methods to minimize environmental impact.
  • Officials will schedule construction to avoid peak wildlife activity.

NHAI will enforce eco-friendly construction practices, including noise barriers and scheduled work hours to avoid peak wildlife activity. Environmental groups praised the initiative, calling it a model for infrastructure and wildlife conservation.

Construction Timeline and Phasing

Officials plan to start the Assam NH-715 widening project in early 2026, with completion expected by 2029. Construction will occur in three phases:

  1. Kalibor to park boundary (~51.5 km)
  2. Elevated stretch inside Kaziranga (~34.5 km)
  3. Park boundary to Numaligarh

Authorities will implement traffic management and temporary diversions to minimize disruption. Safety signs will guide commuters throughout construction.

Public and Political Reactions

Local communities, industrialists, and lawmakers welcomed the Assam NH-715 widening approval. Politicians highlighted its potential to improve regional connectivity and support tourism and industry.

Moreover, tourism operators noted that the elevated roads will allow more visitors to Kaziranga National Park without harming wildlife. Residents expressed optimism that travel times between Kalibor and Numaligarh could decrease significantly, making access to schools, hospitals, and markets easier.

READ MORE: Assam Road Accidents Kill Six During Durga Puja

Safer Roads and Sustainable Infrastructure

Authorities have announced plans to engage communities and improve road safety awareness. For example:

  • They will provide regular traffic updates and online advisories.
  • They will place signage highlighting wildlife zones and speed limits.
  • Forest officials will monitor construction within Kaziranga to ensure compliance with environmental safeguards.

Consequently, citizens are encouraged to follow traffic rules and report violations to help prevent accidents.

Safer Roads and Sustainable Development

The Assam NH-715 widening project represents a major step toward safer, faster, and environmentally conscious infrastructure in Northeast India. Citizens and tourists should stay informed about construction updates and comply with traffic regulations.

Furthermore, this project highlights the possibility of balancing infrastructure development with wildlife conservation. By following safety measures, everyone can contribute to a safer and more sustainable transportation network.

Ads